SOLUTIONS / Main Contractors

Keep installation reviews connected to the work.

Compare site implementation with BIM, investigate differences and bring a shared reference to coordination discussions.

Discuss your project
THE VALUE FOR YOUR TEAM

A review with useful context.

01

Less time finding the reference

Organise captures by building, level and location, with dated versions.

02

A more specific coordination review

Inspect model context alongside the actual site condition.

03

Issues grounded in observations

Report discrepancies identified through automatic findings or manual comparison.

A PRACTICAL EXAMPLE

From a project question to a next step.

ILLUSTRATIVE WORKFLOW

Before closing a ceiling, an engineer checks the visible services against the BIM reference. A suspected route difference is reviewed in context before an issue is raised.

WHAT THE REVIEW SHOULD PRODUCEA specific installation question supported by the relevant site view.
HOW IT FITS YOUR DAY

Three steps. One shared reference.

  1. 01

    Capture the condition

    Keep dated evidence before the next stage changes what remains visible.

  2. 02

    Compare with design intent

    Inspect the same room or station in the BIM and site views.

  3. 03

    Report what needs attention

    Verify the finding and record an issue for the project team.

RELEVANT PLATFORM AREAS

Explore the supporting workflows.

YOUR NEXT STEP

Bring one project question. Leave with a clearer scope.

Walk through the relevant workflow, source information and rollout requirements with the BIMerge team.

Request a demo