SOLUTIONS / Site Teams

Show the condition. Explain the issue.

Keep a dated visual record of the site and bring design context into the observations engineers need to report.

Discuss your project
THE VALUE FOR YOUR TEAM

A review with useful context.

01

Evidence you can revisit

Return to earlier captures when the construction condition has changed.

02

Design beside the work

Compare the visible installation with the BIM reference.

03

A clearer issue description

Report the observed difference in its location and project context.

A PRACTICAL EXAMPLE

From a project question to a next step.

ILLUSTRATIVE WORKFLOW

A team member reviewing a room notices a potential installation difference. The dated capture and BIM view provide a shared starting point for the engineer’s investigation.

WHAT THE REVIEW SHOULD PRODUCEAn observation that another engineer can understand and revisit.
HOW IT FITS YOUR DAY

Three steps. One shared reference.

  1. 01

    Find the room

    Select the building, level and capture station.

  2. 02

    Inspect the date and view

    Look around the 360° image and compare against the design.

  3. 03

    Report the observation

    Describe the discrepancy and identify what needs verification.

RELEVANT PLATFORM AREAS

Explore the supporting workflows.

YOUR NEXT STEP

Bring one project question. Leave with a clearer scope.

Walk through the relevant workflow, source information and rollout requirements with the BIMerge team.

Request a demo